Location: Singapore

Client: AMNGR

Project year: December 2012

Project type: Equipment overhauling

GOE Role: Project Manager

Workscope:

  • Compressor dismantled and cleaned,
  • Old paint removed,
  • Compressor component inspected and checked for excessive wear,
  • Crankshaft bearing and seals replaced,
  • Piston and piston rings on boar stages replaced with new one,
  • Piston clearance in old cylinder liner,
  • Comp #1 first stage 0.2 mm, second stage 0.15mm,
  • Comp #2 first stage 0.2 mm, second stage 0.15mm,
  • Valve set also replaced with new one,
  • Used valve set reconditioned and bring back to store,
  • Compressor assembled and spray peanted,
  • Installed on basement and align with el motor,
  • Intercooler pipes between stages installed new,
  • Replaced new spider coupling,
  • El. Motor overhauled in shore shop.