Location: Singapore
Client: AMNGR
Project year: December 2012
Project type: Equipment overhauling
GOE Role: Project Manager
Workscope:
- Compressor dismantled and cleaned,
- Old paint removed,
- Compressor component inspected and checked for excessive wear,
- Crankshaft bearing and seals replaced,
- Piston and piston rings on boar stages replaced with new one,
- Piston clearance in old cylinder liner,
- Comp #1 first stage 0.2 mm, second stage 0.15mm,
- Comp #2 first stage 0.2 mm, second stage 0.15mm,
- Valve set also replaced with new one,
- Used valve set reconditioned and bring back to store,
- Compressor assembled and spray peanted,
- Installed on basement and align with el motor,
- Intercooler pipes between stages installed new,
- Replaced new spider coupling,
- El. Motor overhauled in shore shop.