Location: Singapore
Client: AMNGR
Project year: 2013
Project type: Equipment overhauling
GOE Role: Project Manager
Workscope:
- Removing filter-silencer
- Removing air suction,
- Air diffuser removing
- Removing impeller,
- Removing hex collar screw at the impeller hub,
- Filled tapped hole with grease and screw in extracting device,
- Impeller pulled out and removed,
- Removed diffuser and shaft,
- Removed gas outlet flange from turbine end,
- Pulling out nozzle ring, inspected for cracks at the guide vanes,
- Removed complete bearing housing,
- Dismantled radial bearing with thrust ring and thrust bearing,
- check for wear,
- Cleaning all parts,
- Replaced bearing,
- Replaced thrust ring,
- Replaced ring piston,
- Replaced O rings