Location: Singapore

Client: Gryphon energy (DS Gusto Pelican)

Project duration: May 2013 – August 2013

Project type: Design & Engineering

GOE Role: Design & Engineering, Project Manager

Workscope:

  • Redesign of moon pool and rig floor
  • New BOP running system design
  • Fabrication and assembly drawings
  • Complete documentation package